So here is the first of the ones I've had to redo because the gridlines wouldn't wash out of the dark green fabric. It's the Year of the Snake. The other one I have to do is Year of the Rooster. Everything is the same as last time except the fabric is a pale blue (so I could use my blue grid pen which I KNOW will wash out).
Showing posts with label Year of the Snake. Show all posts
Showing posts with label Year of the Snake. Show all posts
Monday, September 10, 2012
Monday, July 30, 2012
Year of the Snake (3) FINISHED!
Here's the last of the Year of the Snake. Still 14ct Aida, 2x1 full. I thought it would look better on the green than it does. Maybe when I wash the white lines off it will look better. I'm not exactly sure how I'm going to paint the frame for this one. I have time to experiment. I only have 3 left and that includes the one I'm doing for myself. I'm actually getting really excited to finish these and start to get them frame. I still have a lot of the frames I need to paint but I can't wait until I'm finished with the whole project.
Monday, April 16, 2012
Year of the Snake (2) finished
Here's my latest finish. It's the Year of the Snake on Navy. I still have one more of these to do. It was much easier to stitch this second time, not that it was really hard the first time though. According to my list I'm done for the month of April. I planned out 2 a month so I'm ahead of schedule. I could take the rest of the month off from this design . . . or I could start the next one and get even more ahead of schedule.

I've been only working on these while in the office at work. I'd sit at my desk on my breaks and lunch hour to stitch. Unfortunately, lately I've been interrupted a lot so I wasn't getting much done. I decided I would work on them at night while at home. I think that's why I got ahead of schedule. I'm thinking if I worked on them at work and at home at night I could do one a week. At that rate I'll be done with them the week of he 4th of July.
I'm really toying with that idea. On one hand I'd love to get these done sooner rather than later so I have time to plan and paint the frames, etc. Also I would be finally done with them so I could spend my stitching time to work on something just for me. After all that was my plan for this year (to only stitch things for me) since I've spent so much time stitching things for other people. There's so many projects I want to do besides the ones I've already stitched.
On the other hand I might get bored with doing almost the same thing week after week. I might start making a lot of mistakes. Or I might end up putting them away for awhile only to find I'm almost at of time to finish them come Christmas time. I was under the gun last year for the box I painted. And a year before that when I did afghans for everybody. I hate leaving things to the last minute. I never feel like I did my best when I work that way.
Lately I've really had a stitching bug going. There's nothing else I want to do besides stitch. Maybe I should ride that out and work on these projects while I still want to. I've got a small vacation coming up and I know I'll be taking my stitching along and I wonder if I could start and finish one in that trip. Or maybe even finish 2. We'll see.

I've been only working on these while in the office at work. I'd sit at my desk on my breaks and lunch hour to stitch. Unfortunately, lately I've been interrupted a lot so I wasn't getting much done. I decided I would work on them at night while at home. I think that's why I got ahead of schedule. I'm thinking if I worked on them at work and at home at night I could do one a week. At that rate I'll be done with them the week of he 4th of July.
I'm really toying with that idea. On one hand I'd love to get these done sooner rather than later so I have time to plan and paint the frames, etc. Also I would be finally done with them so I could spend my stitching time to work on something just for me. After all that was my plan for this year (to only stitch things for me) since I've spent so much time stitching things for other people. There's so many projects I want to do besides the ones I've already stitched.
On the other hand I might get bored with doing almost the same thing week after week. I might start making a lot of mistakes. Or I might end up putting them away for awhile only to find I'm almost at of time to finish them come Christmas time. I was under the gun last year for the box I painted. And a year before that when I did afghans for everybody. I hate leaving things to the last minute. I never feel like I did my best when I work that way.
Lately I've really had a stitching bug going. There's nothing else I want to do besides stitch. Maybe I should ride that out and work on these projects while I still want to. I've got a small vacation coming up and I know I'll be taking my stitching along and I wonder if I could start and finish one in that trip. Or maybe even finish 2. We'll see.
Thursday, November 24, 2011
Year of the Snake (Ivory)
Subscribe to:
Posts (Atom)

.jpg)